Wyoming's data center market runs almost entirely through Cheyenne, where Microsoft and Meta have both committed to major campuses — drawn by a sales tax exemption on equipment, an accommodating state government, and utilities willing to build dedicated new generation for large loads.

⚡ TL;DR — Wyoming Data Center Overview

  • Market stage: Concentrated almost entirely in Cheyenne, with two hyperscale anchors (Microsoft, Meta)
  • Top market: Cheyenne — Microsoft's ~3,200-acre planned campus and Meta's 960-acre, $800M+ campus
  • Grid: Western Interconnection (WECC); Black Hills Energy serves the Cheyenne area, Rocky Mountain Power (PacifiCorp) elsewhere
  • Incentives: sales tax exemption on data center equipment; Gov. Gordon's June 2026 executive order prioritizing data center development
  • Power model: large loads increasingly paired with dedicated new generation — Meta's site plans 365 MW solar plus a 200 MW/1,600 MWh battery system

Active Wyoming Markets

  • Cheyenne (primary — Microsoft and Meta campuses)
  • Surrounding Laramie County industrial corridors

State Incentive Levers

  • Sales tax exemption on data center equipment purchases
  • Executive Order 2026-03, "Data Centers the Wyoming Way"
  • Utility-structured large-load tariffs (e.g. Black Hills Energy's LPCS) that pair new supply with new demand

Site Intake

Have land in Wyoming near Cheyenne-area transmission infrastructure?

Submit it for a confidential data center site review. No obligation.

Your information is reviewed privately. We only use submissions to evaluate potential fit and relevant opportunities.

Grid & Utilities in Wyoming

Wyoming sits in the Western Interconnection, separate from ERCOT, PJM, and SPP, with Black Hills Energy and Rocky Mountain Power (PacifiCorp) as the state's primary utilities. What sets Wyoming apart is how its largest deals have been structured: Microsoft's arrangement with Black Hills Energy runs through the Large Power Contract Service (LPCS) tariff, under which Microsoft directly pays for infrastructure upgrades and the power the utility procures on its behalf — a model that shifts cost risk onto the large-load customer rather than the broader ratepayer base. Meta's roughly $1.2B Cheyenne campus goes further, pairing the site with 365 MW of dedicated solar generation and a 200 MW / 1,600 MWh Tesla-supplied battery storage system, rather than relying solely on existing grid capacity. For a landowner, this means Wyoming deals of real scale often involve co-locating or adjoining new generation, not just proximity to an existing substation — see our interconnection queue guide for how the underlying utility study process generally works.

Key Development Considerations

  • Wyoming's data center market is heavily concentrated in Cheyenne — land elsewhere in the state has far less established demand and should be evaluated on its own merits, not assumed to carry Cheyenne-level interest
  • Large-load tariffs like Black Hills Energy's LPCS shift infrastructure cost risk to the buyer, which can affect deal structure and timeline compared to a standard industrial interconnection
  • Some of the largest Wyoming deals have paired data center land with adjacent generation and storage development — a parcel with room for co-located solar or battery infrastructure may be more attractive to a hyperscale buyer
  • Confirm current sales tax exemption terms with the Wyoming Department of Revenue, since incentive programs and thresholds can change

Land Values in Wyoming

Land values near Cheyenne have moved with the market's hyperscale attention, while land elsewhere in the state remains priced more like traditional rural or agricultural acreage. Given the concentration of demand around a single metro, we recommend a local commercial broker comp for your specific submarket, or submitting your parcel directly for review. See also how much power a data center needs by facility size and why land near substations matters to value.

General information, not financial or legal advice.

Frequently Asked Questions

Is Wyoming a good state for data center development?

Increasingly, yes — anchored almost entirely by Cheyenne. Microsoft announced intent in April 2026 to purchase roughly 3,200 acres near Cheyenne for a data center campus, and Meta is developing a 960-acre, $800M+ campus there with plans for over 700,000 square feet of facility space. Outside the Cheyenne corridor, Wyoming's data center market is still thin.

What incentives are available for data centers in Wyoming?

Wyoming's sales tax exemption on data center equipment purchases is the headline incentive, and reporting on Meta's Cheyenne project has cited it as a deciding factor. Gov. Mark Gordon also signed Executive Order 2026-03, 'Data Centers the Wyoming Way,' in June 2026, declaring data center development a state economic development priority — worth confirming current program specifics before modeling a deal.

What grid or utility serves Wyoming data centers?

It depends on the site — Cheyenne-area projects are largely served by Black Hills Energy, while other parts of the state fall under Rocky Mountain Power (PacifiCorp). Wyoming sits in the Western Interconnection (WECC), not PJM, ERCOT, or SPP. Microsoft's Cheyenne deal runs through Black Hills Energy's Large Power Contract Service (LPCS) tariff, under which Microsoft directly pays for the infrastructure upgrades and power procurement its load requires.

How is a large data center like Meta's Cheyenne campus powered?

With a mix of new generation built specifically for the load. Meta's roughly $1.2B Cheyenne site includes plans for 365 MW of solar generation and a 200 MW / 1,600 MWh battery energy storage system supplied by Tesla — an example of how large loads in Wyoming are increasingly paired with dedicated new generation rather than drawing entirely from existing grid capacity.

Can I submit land in Wyoming for data center consideration?

Yes. If you own or represent land in Wyoming near Black Hills Energy or Rocky Mountain Power transmission infrastructure, substations, or industrial corridors — especially in the Cheyenne area — submit it via our site intake form for a confidential review. No obligation.

Site Intake

Own or represent land in Wyoming?

Submit it for a confidential data center site review. No obligation.

Your information is reviewed privately. We only use submissions to evaluate potential fit and relevant opportunities.